English
English
English

Case Studies

Case Studies

Model for calculation and construction process

A digital building model is required for the serial renovation of an old building, which can be created accurately, quickly, and cost-effectively.

Nov 22, 2025

About Wuttke Engineers
Wuttke Engineers have been planning and realizing precise surveying and construction projects since 2005.

Area
1,200

Building Type
Old Building

Processing Time
24 hours

Challenge

Our client needed a BIM model for a project in the area of serial rehabilitation that accurately represents the current building. The challenge was to create the model quickly and without significant effort. Therefore, the client chose Points2BIM.

Solution

To create the BIM model, we went through two stages: First, our AI generated the BIM base model in 2 instead of 20 hours. After reviewing the model, our expert team optimized it based on the client's specifications to ensure the highest efficiency and quality.

Result

The client received a BIM model (LOD 200) within 24 hours, allowing for further development and customization to be discussed with our expertise. As a result, he received the finished model in half the time, with a maximum deviation of 2 cm from the point cloud.

With Points2BIM, we quickly receive a base model on which we can build efficiently.

Oliver Wuttke, Managing Director Wuttke Engineers

Start today to digitize your buildings.

Faster, smarter, and verified BIM models — ready for Revit, Archicad, and IFC

Start today to digitize your buildings.

Faster, smarter, and verified BIM models — ready for Revit, Archicad, and IFC

Start today to digitize your buildings.

Faster, smarter, and verified BIM models — ready for Revit, Archicad, and IFC

Scan2BIM: Fast, simple, automated as-built modeling.

Copyright © 2025 Points2BIM. All rights reserved.

Scan2BIM: Fast, simple, automated as-built modeling.

Copyright © 2025 Points2BIM. All rights reserved.

Scan2BIM: Fast, simple, automated as-built modeling.

Copyright © 2025 Points2BIM. All rights reserved.