Precise BIM for complex retail spaces.
How Points2BIM quickly, reliably, and completely digitized an existing building of 11,000 m² for Kaufland - and thereby noticeably accelerated planning and approval processes.
Sep 28, 2025
About Kaufland
Kaufland is one of the leading retail chains in Europe and operates hundreds of large-scale retail locations with high demands for precision, documentation, and planning reliability.
Area
11,000 m²
Type
Existing building – Retail space
Result
BIM model LOD 300, MEP and terrain modeling
Challenge
For the renovation of an 11,000 m² retail building, Kaufland required a fast and highly precise BIM documentation of the complete inventory. The challenge lay in the size of the area, the multitude of technical installations, and the necessity to seamlessly integrate architectural, MEP, and terrain data into a single model. The goal was to significantly accelerate the planning and approval processes while ensuring the highest accuracy.
Solution
Points2BIM created a comprehensive BIM model based on the point cloud that integrated architectural, MEP, and terrain structures in a continuous workflow. Through automated processing, large amounts of data could be handled efficiently and consistently.
The seamless process significantly reduced complexity for Kaufland and enabled reliable documentation of all relevant construction elements – precise, structured, and immediately reusable.
Result
Significantly reduced coordination times between planning, engineering, and construction execution
Faster approval processes, as all stakeholders could access a uniform, precise model
Maximum accuracy and reliability in the documentation of large existing areas
An efficient foundation for further planning and renovation steps
Kaufland confirms the high quality of the collaboration:
Points2BIM meets our high demands for accuracy and reliability – a perfect combination of technical excellence and pragmatic implementation.
Marina Fischer, Kaufland




